Gowen Field C-130 Hangar — Military Aviation Facility Design, Boise Idaho | Fine Line Studio
Gowen Field C-130 Hangar — Idaho Air National Guard — Fine Line Studio

Industrial  •  Government / Military  •  Gowen Field, Boise, Idaho

Gowen Field
C-130 Aircraft Hangar

Client: Idaho Air National Guard
Type: Military Aviation Facility
Compliance: FAA + Military Security Standards
Home / Portfolio / Gowen Field C-130 Hangar
Project Type
Military Aviation
Facility
Client
Idaho Air
National Guard
Location
Gowen Field
Boise, Idaho
Building System
Pre-Engineered Metal
Clear-Span
Tags
Industrial Government Military

The Idaho Air National Guard required a modern hangar facility to support its fleet of C-130 aircraft at Gowen Field in Boise. The challenge was to design a large-span structure capable of meeting rigorous FAA, military, and security standards — while integrating maintenance, operations, and administrative support spaces within a single highly functional building. The seasonal climate conditions of the region and the specialized equipment requirements of military aviation added further technical demands to an already complex project type.

A pre-engineered metal building with expansive clear-span bays provides sufficient floor area to house multiple C-130 aircraft simultaneously. The layout separates dedicated maintenance areas, parts storage, and administrative offices to streamline operations and support mission workflows. Reinforced structural systems, heavy-duty hangar doors engineered for operational reliability, and weather-resistant detailing ensure continuous functionality under demanding conditions. Mechanical and electrical systems were coordinated to support specialized aviation equipment and safety requirements throughout the facility.

A state-of-the-art hangar facility providing the Idaho Air National Guard with the infrastructure required for mission readiness and operational efficiency. The clear-span bays, integrated maintenance and support spaces, and security-compliant design position the building as a long-term operational asset at Gowen Field — a cornerstone of the Guard's aviation infrastructure in Idaho.

Why This Matters

Government and military facility work demands the highest standard of technical coordination: FAA compliance, military security protocols, specialized MEP systems, and zero tolerance for schedule or scope error. Delivering a project at this scale and complexity for the Idaho Air National Guard is significant institutional credibility — the same rigor that government procurement requires, commercial developers and industrial clients also value.

This project was completed in collaboration with CSHQA Architects. Fine Line Studio contributed to design development and production documentation as a collaborating architect.

Working on a large-span industrial or government facility project?

Schedule a 30-Minute Review